Concrete Removal and Replacement in Boulder, Colorado
Old, failing slabs broken out and hauled away, then replaced with new concrete on a prepared base.
- Typical cost. Removal runs $3 to $8 per square foot including disposal, and a driveway averages $1,200 to $4,500 (HomeGuide, 2026).
- New concrete. A new driveway costs $6 to $15 per square foot, and a 2-car driveway runs $2,400 to $8,600 (HomeGuide, 2026).
- Before you tear out. Leveling ($3 to $12 per square foot) and resurfacing ($3 to $7) cost less when the slab is still sound.
- Permits. Concrete in the public right of way needs a permit to remove, and large jobs with a dumpster may too (HomeGuide, 2026).
- Free estimate. A technician measures the slab and gives you a written price for removal and the new pour before any work begins.
- Service area. The whole city, plus Gunbarrel, Niwot, Lafayette, Louisville, Superior, Longmont, and Erie.
Is your concrete past saving? Boulder Concrete Repair Co. does concrete removal and replacement for driveways, patios, walkways, and steps for homeowners throughout Boulder, Colorado, breaking out the old slab, hauling it away, and pouring new concrete that is built to last.
Tearing out concrete costs real money, so we only recommend it when repair will not hold. If leveling, crack repair, or resurfacing can save your slab, we will tell you. When the slab is too far gone, one crew handles the removal, the base prep, and the new pour, so you deal with one contractor instead of two. Replacement is one of our concrete repair services for the whole city.
How Concrete Removal and Replacement Works
The job has two halves, taking the old slab out and putting the new one in. We quote both together.
- Measure and plan. We measure the slab, check for rebar and access, and write up one price for the whole job.
- Break out and haul away. The old concrete is cut, broken up, and carted off, so you are not left with a pile.
- Prepare the base. We regrade and compact the ground so the new slab sits on firm, even support.
- Form and pour. We set forms, pour, finish the surface, and cut control joints so the slab cracks where we want it to.
- Cure and clean up. The slab cures, and we remove the forms and leave the site clean.
What Concrete Removal and Replacement Costs
You get a firm written price after we see the job. These published figures show where most projects land.
| Project | Typical removal cost | Typical new concrete cost |
|---|---|---|
| Driveway | $1,200 to $4,500 | $6 to $15 per sq ft, $2,400 to $8,600 for a 2-car |
| Patio (20 by 20 feet) | $1,200 to $3,000 | $4 to $12 per sq ft plain, $8 to $30 stained or stamped |
| Sidewalk (50 feet long) | $750 to $1,250 | $7 to $17 per sq ft |
| Steps | $250 to $500 | $200 to $500 per step |
Sources: HomeGuide cost guides for concrete removal, driveways, patios, sidewalks, and steps (2026), which are national averages. Local quotes can run higher or lower.
Concrete Removal or Repair? How to Decide
Removal is the right call when the slab has large cracks, crumbling, or structural problems. It also makes sense when a repair would need a new layer more than two inches thick. If the damage is smaller, a repair costs far less than starting over.
| If the slab is | Usual answer |
|---|---|
| Sunken but otherwise solid | Level it, $3 to $12 per sq ft |
| Worn or scaled but solid | Resurface it, $3 to $7 per sq ft |
| Cracked through, crumbling, or heaved | Remove and replace |
We tell you honestly which one fits, even when it means a smaller job for us.
What Concrete Removal Costs by Slab Size
HomeGuide prices removal by size for slabs 3 to 6 inches thick. Thicker slabs, heavy rebar, and hard access push a job toward the top of each range.
| Slab size | Average removal cost |
|---|---|
| 100 square feet | $300 to $800 |
| 200 square feet | $600 to $1,600 |
| 400 square feet | $1,200 to $3,200 |
| 600 square feet | $1,800 to $4,800 |
| 1,000 square feet | $3,000 to $8,000 |
Source: HomeGuide removal cost guide (2026).
Permits and Dumpsters
HomeGuide says you need a permit to remove concrete in the public right of way, and a large job with a dumpster may need a dumpster permit too. If your sidewalk or driveway apron sits in the city's right of way, ask us to explain the permit steps before the crew arrives.
What a Good Replacement Quote Lists
Two quotes can look alike and cover very different work. Check that yours spells out each of these:
- Removal and haul-away of the old concrete, with the disposal cost included
- Base preparation and compaction under the new slab
- Slab thickness, reinforcement, and control joints
- The finish, such as broom, smooth, colored, or stamped
- Who pulls any permit, and when you can walk or drive on the new slab
Signs Your Slab Needs Replacing in Boulder
Most slabs that need replacing show several of these at once:
- Cracks that run through the whole slab and keep widening
- Crumbling, flaking, or pitted concrete across most of the surface
- A slab heaved or sunk so far that leveling would not make it flat
- Earlier patches that have failed more than once
- Concrete you plan to replace with a new layout, grade, or finish
Replace a failing slab before it becomes a trip hazard or lets water under the house.
Why Concrete Fails Here
Boulder's freeze-thaw cycles work on concrete all winter. Water gets into small cracks, freezes, and widens them, and de-icing salt makes the surface scale. Older neighborhoods near downtown and University Hill have original concrete that has had decades of it.
A new slab needs a firm base, correct joints, and a sealer to last through the same winters. Those details are what we spell out in the quote.
Frequently Asked Questions
How much does concrete removal cost?
Concrete removal costs $3 to $8 per square foot including disposal, and removing a driveway averages $1,200 to $4,500 (HomeGuide, 2026). Your written estimate gives the exact price.
How much does a new concrete driveway cost?
A new concrete driveway costs $6 to $15 per square foot, or $2,400 to $8,600 for a 2-car driveway (HomeGuide, 2026). That is on top of removing the old slab.
Do I need a permit to remove concrete?
You do if the concrete is in the public right of way, and a large job with a dumpster may need a dumpster permit (HomeGuide, 2026). We walk you through it.
Can you remove and replace just part of a slab?
Often, yes. We cut out the failed section and pour a new panel, which costs less than replacing everything. We tell you if a patch would stand out or fail again.
How long before I can use the new concrete?
Foot traffic usually comes first, with vehicles needing longer. We give you the exact timing at your estimate.
Do you haul away the old concrete?
Yes. Removal includes hauling the broken concrete off, so you are not left with a pile in the driveway.
Ready to Replace Your Concrete?
Get a free, honest estimate on concrete removal and replacement in Boulder today.